| Issue Date | Title | Author(s) | Fulltext |
1 | 2002 | CGG-LTA Data Interface Control Document | PASIAN, Fabio; SMAREGLIA, Riccardo ; ZACCHEI, Andrea | none |
2 | 2002 | CMU to Data Handling of LBC: Data Interface Control Document | SMAREGLIA, Riccardo ; DI PAOLA, Andrea | none |
3 | 2002 | Considerations about the possibility to remove the SC signal by monitoring the SC activity | MARIS, Michele ; MENNELLA, ANIELLO | none |
4 | 2002 | DMC discussion at the Planck LFI workshop | BURIGANA, CARLO ; Lama, Nicola | none |
5 | 2002 | LFI/HFI Common Software Development Plan | PASIAN, Fabio; Mercier, Claude | none |
6 | 2002 | LTA/Planck Beowulf system: Architectural and User Guide | SMAREGLIA, Riccardo ; ZACCHEI, Andrea ; Sgorlon, Marco; GASPARO, Federico | none |
7 | 2002 | On the calculation of the ratio between the Standard Error and the R.M.S. error for the Quantization, Reconstruction and Averaging of a noisy signal | MARIS, Michele | none |
8 | 2002 | Planck Ground Segment Interface Requirements Document | Aloy, L.; Bremer, M.; Byutler, C.; Charra, J.; Guglielmi, L.; Laureijs, R.J.; Mercier, Claude; Peccia, N.; Schmidt, M.; Tauber, J.; ZACCHEI, Andrea | none |
9 | 2002 | Planck IDIS DMC Architectural Design Document | Lama, Nicola; Mercier, Claude | none |
10 | 2002 | Planck LFI - Models for the I/O of the Toolbox Interface | MARIS, Michele | none |
11 | 2002 | Planck LFI - Suggested Vector and Matrix Algebra Capacities for the QLA Toolbox | MARIS, Michele | none |
12 | 2002 | Planck LFI DPC software Configuration Management Plan | Bottega, F.; ZACCHEI, Andrea | none |
13 | 2002 | Planck LFI DPC Software Product Assurance Plan | Bottega, F.; ZACCHEI, Andrea | none |
14 | 2002 | Planck LFI DPC Software Project Development Plan | Bottega, F.; ZACCHEI, Andrea | none |
15 | 2002 | Planck LFI DPC – Internal Interfaces Requirements Document | PASIAN, Fabio | none |
16 | 2002 | Planck LFI DPC – List of ICDs and MoUs | Fasian, Fabio | none |
17 | 2002 | Planck LFI Level I Data Model Incremental Architectural Design Document | Lama, Nicola; Albetti, G.; Fogliani, Sandro; Maino, Davide; MARIS, Michele ; ZACCHEI, Andrea | none |
18 | 2002 | Planck LFI Memorandum of Understanding and DPC Letters of Agreement | PASIAN, Fabio | none |
19 | 2002 | Planck LFI – DPC Product Tree (PT) and Work Breakdown Structure (WBS) | Taddei, Edoardo; PASIAN, Fabio | none |
20 | 2002 | Planck LFI – DPC Software Integration, Verification and Validation Plan | Popa, Lucia; MARIS, Michele ; PASIAN, Fabio; Bottega, F. | none |