AAVS1 Hybrid Cable's assembly and testing procedure
Date Issued
2019
Author(s)
Abstract
This document describes the procedure whereby the 440 AAVS1 (Aperture Array Verification System) FEM were reworked by Lightech s.r.l. to be compatible with the pyramid assembly created by UCAM. Then there is a description of the reworking verification and the final testing procedure of the HC (Hybrid Cables).
Report number
3
Rights
open.access
File(s)![Thumbnail Image]()
![Thumbnail Image]()
Loading...
Name
AAVS1 hybrid cable assembly and test.pdf
Size
2.2 MB
Format
Adobe PDF
Checksum (MD5)
6fe935660fac62ffe706904dea6fa8c3
Loading...
Name
Rapporti_Tecnici_modello-autorizzazione_Rusticelli.pdf
Description
[Administrators only]
Size
117.86 KB
Format
Adobe PDF
Checksum (MD5)
0f03f42df0551b83039c861dcc37d41f