Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/20.500.12386/33070
Titolo: | JUNO Jiram payload contingency plan | Autori: | CICCHETTI, ANDREA NOSCHESE, RAFFAELLA |
Data pubblicazione: | 2016 | Abstract: | The aim of this document is to provide to the Juno project, the on-board configuration of JIRAM instrument, that should be loaded and then executed by the instrument, whenever it is necessary to verify the correct functioning of the instrument. This Payload Contingency Plan consists of two timelines, the first one to be used if the Spacecraft Dynamics are enabled, the second one if the Spacecraft Dynamics are not enabled. | URI: | http://hdl.handle.net/20.500.12386/33070 | Fulltext: | open |
È visualizzato nelle collezioni: | 4.03 Rapporti di progetto |
File in questo documento:
File | Descrizione | Dimensioni | Formato | |
---|---|---|---|---|
JIRAM_PAYLOAD_CONTINGENCY_PLAN_ISSUE_7_REV_0.pdf | 138.26 kB | Adobe PDF | Visualizza/apri |
Page view(s)
42
controllato il 24-apr-2024
Download(s)
6
controllato il 24-apr-2024
Google ScholarTM
Check
Tutti i documenti in DSpace sono pubblicati ad Accesso Aperto, salvo diversa indicazione per alcuni documenti specifici.