Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/20.500.12386/33237
Campo DC | Valore | Lingua |
---|---|---|
dc.contributor.author | Buenadicha, Guillermo | en_US |
dc.contributor.author | Sauvage, Marc | en_US |
dc.contributor.author | FRAILIS, Marco | en_US |
dc.contributor.author | GASPARETTO, Thomas | en_US |
dc.contributor.author | Nguyen-Kim, Hoang | en_US |
dc.contributor.author | Casenove, Pierre | en_US |
dc.date.accessioned | 2023-02-08T09:55:34Z | - |
dc.date.available | 2023-02-08T09:55:34Z | - |
dc.date.issued | 2020 | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12386/33237 | - |
dc.description.abstract | The purpose of this document is to define the IV&VP (Integration, Verification & Validation Plan) of the Euclid SGS LE1 Processing Function. In conjunction with the Euclid SGS IV&V Plan, this document contributes to fully define the whole Integration, Verification & Validation plan of the Euclid SGS project, according to the bottom-up approach being part of the Euclid SGS wide-policy for the IV&V plan. Most of this verification and validation will take place at SGS integration level, but some local integration activity could be necessary also for the production of a single specific Euclid SGS product as LE1. | en_US |
dc.language.iso | eng | en_US |
dc.title | Euclid SGS LE1 Processing Function Integration, Validation and Verification Plan | en_US |
dc.type | Research report | - |
dc.relation.medium | ELETTRONICO | en_US |
dc.relation.volume | EUCL-ESAC-PL-8-005 | en_US |
dc.relation.numberofpages | 102 | en_US |
dc.type.referee | REF_1 | en_US |
dc.description.note | Version 0.9 reviewed by ESA at the Euclid SGS System Requirements Review (2015) Version 1.2 reviewed by ESA at the Euclid SGS Design Review (2017) Version 2.3 reviewed by ESA at the Euclid SGS Implementation Review (2021) Version 2.3 also submitted as reference document for the Euclid SGS Readiness Review (2022) | en_US |
dc.description.numberofauthors | 6 | en_US |
dc.description.international | sì | en_US |
dc.contributor.country | ITA | en_US |
dc.contributor.country | FRA | en_US |
dc.contributor.country | ESP | en_US |
dc.relation.scientificsector | FIS/05 - ASTRONOMIA E ASTROFISICA | en_US |
dc.type.miur | 298 Altro | - |
dc.relation.ercsector | ERC sectors::Physical Sciences and Engineering::PE9 Universe sciences: astro-physics/chemistry/biology; solar systems; stellar, galactic and extragalactic astronomy, planetary systems, cosmology, space science, instrumentation::PE9_17 Instrumentation – telescopes, detectors and techniques | en_US |
dc.relation.versioning | 2.3 | en_US |
dc.contributor.approved | Mellier, Yannick | en_US |
dc.description.oa | 2 – prodotto con deroga per i casi previsti dalla Policy (allegare il modulo al passo 5-Carica) | en_US |
item.cerifentitytype | Publications | - |
item.grantfulltext | reserved | - |
item.fulltext | With Fulltext | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.openairetype | Research report | - |
item.languageiso639-1 | en | - |
crisitem.author.dept | O.A. Trieste | - |
crisitem.author.dept | O.A. Trieste | - |
crisitem.author.orcid | 0000-0002-7400-2135 | - |
crisitem.author.orcid | 0000-0002-7913-4866 | - |
È visualizzato nelle collezioni: | 4.03 Rapporti di progetto |
File in questo documento:
File | Descrizione | Dimensioni | Formato | Existing users please |
---|---|---|---|---|
EUCL-ESAC-PL-8-005_v2.3_Euclid_SGS_LE1_IVV_Plan.pdf | [Administrators only] | 2.22 MB | Adobe PDF |
Tutti i documenti in DSpace sono pubblicati ad Accesso Aperto, salvo diversa indicazione per alcuni documenti specifici.