Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33268
Title: | Planck-LFI In-Orbit Calibration and Verification Phase Report: Executive Summary | Authors: | BATTAGLIA, Paola Maria Bersanelli, Marco CUTTAIA, FRANCESCO Davis, Richard FRAILIS, Marco Franceschet, Cristian FRANCESCHI, ENRICO GALEOTTA, Samuele GREGORIO, Anna Leonardi, Rodrigo Lowe, Stuart MARIS, Michele Meinhold, Peter Mendes, Luis MENNELLA, ANIELLO Poutanen,Torsti SANDRI, MAURA TAVAGNACCO, Daniele TERENZI, LUCA Tomasi, Maurizio VILLA, Fabrizio ZACCHEI, Andrea Zonca, Andrea |
Issue Date: | 2009 | Number: | PL-LFI-PST-RP-086 | Abstract: | This document summarises the results obtained during the commissioning tests performed on the LFI integrated on the Planck satellite. Tests have been conducted from June the 4th 2009 to June 26th 2009. Details of the performed activities are discussed in specific reports that will be available after the CPV. | Note: | Planck LFI Commissioning and Performance Verification (CPV) | URI: | http://hdl.handle.net/20.500.12386/33268 | Fulltext: | open |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PL-LFI-PST-RP-086_1.1_CPV.pdf | Planck-LFI In-Orbit Calibration and Verification Phase Report: Executive Summary | 1.12 MB | Adobe PDF | View/Open |
Items in DSpace are published in Open Access, unless otherwise indicated.