Euclid SGS Processing Budget Technical Note
Date Issued
2022
Author(s)
Dabin, Christophe
•
McCracken, Henry Joy
•
Belikov, Andrey
•
Benson, Kevin
•
•
Starck, Jean-Luc
•
Joachimi, Benjamin
•
•
•
Noddle, Keith
•
Casenove, Pierre
Abstract
This document gathers and summarizes the information from the latest performance figures from the Infrastructure and Scientific challenges reports. Release 4.2 of this document is based on the results and metrics from the Scientific Challenge 8 runs. It extrapolates these figures under assumptions clearly stated: for the prelaunch phase, simulation production plan, end-to-end scenarios, and operational rehearsal tests; for the post-launch phase, reprocessing ratio and simulation scenarios. This document highlights the most stringent assumptions and uncertainties about these figures, assesses the consequences of this processing budget on the SGS architecture, identifying bottlenecks, risks and action plans; it matches the infrastructure procurement strategy for the different stakeholders (SDC’s) of the Euclid Consortium with the infrastructure requirements derived from this document.
This document is a living document: its origins are in the Preliminary Requirements Review with raw inputs and rough estimates from OU/SDC’s. This document will continue to be updated as necessary.
Volume
EUCL-CNE-RP-8-001
Rights
restricted
File(s)![Thumbnail Image]()
Loading...
Name
EUCL-CNE-RP-8-001_v4.2_Euclid_SGS-Budget_Processing_GSRR.pdf
Description
[Administrators only]
Size
5.29 MB
Format
Adobe PDF
Checksum (MD5)
982a16b24b88184f9e0aa95241c43c26