JIRAM Trending Review 2020
Date Issued
2020
Author(s)
Abstract
Purpose of this document is to provide engineering status of JIRAM instrument by reviewing instrument health and performance. The JIRAM Trending Review is required annually by the Juno Project.
JIRAM operated during PJ1 and from PJ4 through PJ27 .
This review cover the period PJ22-PJ27.
Volume
JRM-IAPS-TR-2020
Rights
embargo
File(s)![Thumbnail Image]()
Loading...
Name
JIRAM_TrendingReview2020.pdf
Description
Technical Report
Size
1.24 MB
Format
Adobe PDF
Checksum (MD5)
48c82e75888d8d6cf05da61d1e68f7d5