Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33474
Title: | Planck sorption cooler system cop and cpv test plan | Authors: | MORGANTE, GIANLUCA | Issue Date: | 2009 | Number: | PL-LFI-PST-PL-014 | Abstract: | This document describes the test sequence and procedures of the Planck Sorption Cooler System during Commissioning (COP) and Calibration (CPV) Phases in flight. COP and CPV timelines depend on the specific subsystem considered: SCS, for example, will complete its commissioning and verification phases well before the instruments. For this reason, it will enter Routine Operations when HFI and LFI will still be in their CPV. For each in-flight SCS test or activity all needed info is reported in a table containing test name, description, constraints, duration, pass/fail criteria, operational requirements, procedures etc. | URI: | http://hdl.handle.net/20.500.12386/33474 | Fulltext: | open |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
SCS COP and CPV Test Plan_v1_02.pdf | 613.34 kB | Adobe PDF | View/Open |
Page view(s)
12
checked on Mar 26, 2023
Download(s)
4
checked on Mar 26, 2023
Google ScholarTM
Check
Items in DSpace are published in Open Access, unless otherwise indicated.