Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/20.500.12386/33474
Titolo: | Planck sorption cooler system cop and cpv test plan | Autori: | MORGANTE, GIANLUCA | Data pubblicazione: | 2009 | Numero: | PL-LFI-PST-PL-014 | Abstract: | This document describes the test sequence and procedures of the Planck Sorption Cooler System during Commissioning (COP) and Calibration (CPV) Phases in flight. COP and CPV timelines depend on the specific subsystem considered: SCS, for example, will complete its commissioning and verification phases well before the instruments. For this reason, it will enter Routine Operations when HFI and LFI will still be in their CPV. For each in-flight SCS test or activity all needed info is reported in a table containing test name, description, constraints, duration, pass/fail criteria, operational requirements, procedures etc. | URI: | http://hdl.handle.net/20.500.12386/33474 | Fulltext: | open |
È visualizzato nelle collezioni: | 4.03 Rapporti di progetto |
File in questo documento:
File | Descrizione | Dimensioni | Formato | |
---|---|---|---|---|
SCS COP and CPV Test Plan_v1_02.pdf | 613.34 kB | Adobe PDF | Visualizza/apri |
Page view(s)
30
controllato il 19-apr-2024
Download(s)
18
controllato il 19-apr-2024
Google ScholarTM
Check
Tutti i documenti in DSpace sono pubblicati ad Accesso Aperto, salvo diversa indicazione per alcuni documenti specifici.