Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/20.500.12386/33483
Titolo: | NI-DPU ASW Acceptance test plan | Autori: | Medinaceli Villegas, E. BALESTRA, Andrea FARINELLI, Ruben |
Data pubblicazione: | 2020 | Abstract: | This document details the set of nominal tests performed using the NISP-FM configuration (using both DPU-FMs) RD[2-5], using the flight version of the DPU-ASW v1.3 see RD[8]. Tests were performed during the so-called Thermal Vacuum and Thermal Balance TV3 NISP test campaign, performed at nominal ambient conditions at the Erios vacuum chamber at the LAM laboratory. Since the beginning of this campaign version DPU-ASW v1.3 was deployed in both DPU-FM units, and integration test, preliminary tests, software testing dedicated sessions, dry-runs and nominal operations were performed in this configuration. During preliminary phases even non-nominal sequences were performed in order to verify the robustness of the setup and to finish the test of features of the DPU-ASW not used during nominal routines. All the preliminary test are fully documented in Sections 8, 9 and 11 of RD[1]. NISP Nominal operations were verified during the TV3 campaign, where several sequences covering all the nominal operations of the NISP instrument RD[6] were executed; the TV3 results are presented by the NISP system in RD[7]. Here are detailed all the nominal sequences performed during TV3, as well as the summary of the commands and telemetries validated during the nominal test. | URI: | http://hdl.handle.net/20.500.12386/33483 | Fulltext: | reserved |
È visualizzato nelle collezioni: | 4.03 Rapporti di progetto |
File in questo documento:
File | Descrizione | Dimensioni | Formato | Existing users please |
---|---|---|---|---|
EUCL-IBO-PL-7-023_DPU-ASW Acceptance Test Plan.pdf | [Administrators only] | 1.04 MB | Adobe PDF |
Google ScholarTM
Check
Tutti i documenti in DSpace sono pubblicati ad Accesso Aperto, salvo diversa indicazione per alcuni documenti specifici.