Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33492
DC Field | Value | Language |
---|---|---|
dc.contributor.author | MEDINACELI VILLEGAS, Eduardo | en_US |
dc.contributor.author | Bortoletto, Favio | en_US |
dc.contributor.author | BONOLI, Carlotta | en_US |
dc.contributor.author | BALESTRA, Andrea | en_US |
dc.contributor.author | D'ALESSANDRO, Maurizio | en_US |
dc.contributor.author | FARINELLI, Ruben | en_US |
dc.date.accessioned | 2023-02-15T15:48:32Z | - |
dc.date.available | 2023-02-15T15:48:32Z | - |
dc.date.issued | 2020 | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12386/33492 | - |
dc.description.abstract | The present document describes the Failure Detection Isolation and Recovery (FDIR) procedures implemented by the ASW application software running inside the NISP DPU processors and the FDIR procedures directly implemented on the NISP WE hardware, namely the procedures directly under ASW software supervision and those to be managed at higher level. The present NISP-DPU FDIR reference directly to the NISP Instrument FMEA risk table (DPU part) reported in AD 6, 7 and RD 3, here reviewed on the base of the more advanced level of the HW design: - Catastrophic Failure (G 1): Failure propagation from NISP instrument to the spacecraft or the other instruments. - Critical Failure (G 2): Loss of all primary science objectives. - Major Fault (G 3): Major Degradation of the mission Loss of 1 or 2 primary objectives. | en_US |
dc.language.iso | eng | en_US |
dc.title | DPU-ASW Failure Detection, Isolation and Recovery Document | en_US |
dc.type | Research report | - |
dc.relation.medium | ELETTRONICO | en_US |
dc.relation.numberofpages | 68 | en_US |
dc.type.referee | REF_2 | en_US |
dc.description.numberofauthors | 6 | en_US |
dc.description.international | no | en_US |
dc.contributor.country | ITA | en_US |
dc.identifier.classification | EUCL-OPD-TN-7-007 | en_US |
dc.type.miur | 298 Altro | - |
dc.relation.versioning | 2.0 | en_US |
dc.contributor.approved | Valenziano, Luca | en_US |
dc.description.oa | 2 – prodotto con deroga per i casi previsti dalla Policy (allegare il modulo al passo 5-Carica) | en_US |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.openairetype | Research report | - |
item.languageiso639-1 | en | - |
item.cerifentitytype | Publications | - |
item.grantfulltext | reserved | - |
item.fulltext | With Fulltext | - |
crisitem.author.dept | OAS Bologna | - |
crisitem.author.dept | O.A. Padova | - |
crisitem.author.dept | OAS Bologna | - |
crisitem.author.orcid | 0000-0002-4040-7783 | - |
crisitem.author.orcid | 0000-0003-3228-2180 | - |
crisitem.author.orcid | 0000-0002-6967-261X | - |
crisitem.author.orcid | 0000-0002-8318-0988 | - |
crisitem.author.orcid | 0000-0003-2212-367X | - |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | Existing users please |
---|---|---|---|---|
EUCL-OPD-TN-7-007 DPU ASW FDIR.pdf | [Administrators only] | 1.27 MB | Adobe PDF |
Items in DSpace are published in Open Access, unless otherwise indicated.