Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33547
Title: | DM TEL AIV 2.0 Report | Authors: | BERGOMI, Maria BIONDI, FEDERICO MARAFATTO, Luca |
Issue Date: | 2016 | Number: | CHEOPS-INAF-INST-RP-004 | Abstract: | Between July and December 2015, the TEL DM OMT AIV activities, described in AD11, were performed. This document reports the AIV phase for the CHEOPS DM model, which took place between March and October 2016 at INAF-Padova laboratories. The main goal is to exploit previous experience (AD11) and demonstrate feasibility of the procedure also for PFM model AIV, to be performed by FNM. | URI: | http://hdl.handle.net/20.500.12386/33547 | Fulltext: | reserved |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | Existing users please |
---|---|---|---|---|
CHEOPS-INAF-INST-RP-004_DM_TEL_AIV_2.0_report_Issue2.1.pdf | DM TEL AIV 2.0 Report | 10.06 MB | Adobe PDF |
Page view(s)
24
checked on Apr 30, 2024
Download(s)
2
checked on Apr 30, 2024
Google ScholarTM
Check
Items in DSpace are published in Open Access, unless otherwise indicated.