ICU FM Electrical Integration Test Procedure: AS RUN
Date Issued
2020
Author(s)
•
Borsato, Enrico
•
Di Ferdinando, Donato
•
Davini, Stefano
•
Dusini, Stefano
•
•
Sirri, Gabriele
•
Valieri, Claudia
Abstract
The purpose of this document is to describe the electrical and ASW integration procedure of ICU FM.
The procedure is applicable to the ICU FM integration in preparation to the NISP FM TV test 1 and 2. The integration will use the NISP SCOE as S/C simulator.
The document describes the ICU PFM electrical integration “As Run
Volume
EUCL-INFN-PR-7-006
Rights
restricted
File(s)![Thumbnail Image]()
Loading...
Name
EUCL-INFN-PR-7-006_ICU-PFM 01-Electrical-Integration-Procedure_Issue 1_2_Signed.pdf
Description
[Administrators only]
Size
2.1 MB
Format
Adobe PDF
Checksum (MD5)
ea91f1cd9ad60dc0c780d92f804abe3b