Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33572
Title: | Incoming inspection Report of the NI-DPU/DCU FM02 | Authors: | Salatti, Mario Latini, Valentina Ducret, Franck Grimoldi, Raoul Legramandi, Sergio AURICCHIO, NATALIA |
Issue Date: | 2019 | Number: | EUCL-LAM-RP-7-097 | Abstract: | The purpose of this report is to provide the results of the incoming inspection performed on the DPU/DCU FM 02 delivered by OHB-I, after shipping to the LAM laboratory on 29 October 2019. The inspection report contains the status of the unit after inspection and some pictures of the unpacking and the visual inspection. | URI: | http://hdl.handle.net/20.500.12386/33572 | Fulltext: | reserved |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | Existing users please |
---|---|---|---|---|
EUCL-LAM-RP-7-097_10_DPU_FM02_incoming_inspection_report_2.pdf | [Administrators only] | 2.63 MB | Adobe PDF |
Page view(s)
31
checked on Aug 31, 2024
Download(s)
1
checked on Aug 31, 2024
Google ScholarTM
Check
Items in DSpace are published in Open Access, unless otherwise indicated.