Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/20.500.12386/33572
Titolo: | Incoming inspection Report of the NI-DPU/DCU FM02 | Autori: | Salatti, Mario Latini, Valentina Ducret, Franck Grimoldi, Raoul Legramandi, Sergio AURICCHIO, NATALIA |
Data pubblicazione: | 2019 | Numero: | EUCL-LAM-RP-7-097 | Abstract: | The purpose of this report is to provide the results of the incoming inspection performed on the DPU/DCU FM 02 delivered by OHB-I, after shipping to the LAM laboratory on 29 October 2019. The inspection report contains the status of the unit after inspection and some pictures of the unpacking and the visual inspection. | URI: | http://hdl.handle.net/20.500.12386/33572 | Fulltext: | reserved |
È visualizzato nelle collezioni: | 4.03 Rapporti di progetto |
File in questo documento:
File | Descrizione | Dimensioni | Formato | Existing users please |
---|---|---|---|---|
EUCL-LAM-RP-7-097_10_DPU_FM02_incoming_inspection_report_2.pdf | [Administrators only] | 2.63 MB | Adobe PDF |
Page view(s)
22
controllato il 15-giu-2024
Download(s)
1
controllato il 15-giu-2024
Google ScholarTM
Check
Tutti i documenti in DSpace sono pubblicati ad Accesso Aperto, salvo diversa indicazione per alcuni documenti specifici.