Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33662
Title: | Band 2+3 integration product assurance requirement and procedures | Authors: | RICCIARDI, SARA | Issue Date: | 2016 | Number: | iALMA-TEC-PLA-IAB-002 | Abstract: | This document aims to define the best practices and procedures in the integration and test phase of the prototype of the band 2+3 Cartridge for the ALMA system project. The purpose of these requirements is to ensure that all the components of the B2+3 cartridge and the facilities involved in the integration phase and in the verification phase are delivered with and maintained at a consistently high level of quality in their design, fabrication, performance, reliability, and documentation. This is essential to ensure this prototype will be useful in the context of the ALMA system. | URI: | http://hdl.handle.net/20.500.12386/33662 | Fulltext: | open |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
iALMA-TEC-PLA-IAB-002.pdf | 1.04 MB | Adobe PDF | View/Open |
Page view(s)
27
checked on Apr 26, 2024
Download(s)
11
checked on Apr 26, 2024
Google ScholarTM
Check
Items in DSpace are published in Open Access, unless otherwise indicated.