Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33766
DC Field | Value | Language |
---|---|---|
dc.contributor.author | DE ANGELIS, Elisabetta | en_US |
dc.contributor.author | RISPOLI, ROSANNA | en_US |
dc.contributor.author | COLASANTI, LUCA | en_US |
dc.contributor.author | VERTOLLI, Nello | en_US |
dc.contributor.author | MILILLO, Anna | en_US |
dc.contributor.author | MURA, Alessandro | en_US |
dc.date.accessioned | 2023-02-22T13:20:28Z | - |
dc.date.available | 2023-02-22T13:20:28Z | - |
dc.date.issued | 2016 | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.12386/33766 | - |
dc.description.abstract | This document reports the results of ELENA PFM (Flight Back-Up) calibration campaign, performed at MEFISTO facility in Bern on April 2015. The upgrades of the instrument have been verified, in particular the readout system and the black baffle. The results are considered in comparison with science performance requirement and FS model performances | en_US |
dc.language.iso | eng | en_US |
dc.title | BC-SRN-RP-34268 | en_US |
dc.type | Research report | - |
dc.relation.medium | ELETTRONICO | en_US |
dc.relation.volume | BC-SRN-RP-34254 | en_US |
dc.relation.numberofpages | 37 | en_US |
dc.type.referee | REF_2 | en_US |
dc.description.numberofauthors | 6 | en_US |
dc.contributor.country | ITA | en_US |
dc.relation.scientificsector | FIS/05 - ASTRONOMIA E ASTROFISICA | en_US |
dc.type.miur | 298 Altro | - |
dc.relation.ercsector | ERC sectors::Physical Sciences and Engineering::PE9 Universe sciences: astro-physics/chemistry/biology; solar systems; stellar, galactic and extragalactic astronomy, planetary systems, cosmology, space science, instrumentation | en_US |
dc.relation.versioning | 1.4 | en_US |
dc.contributor.approved | ORSINI, Stefano (PI) | en_US |
dc.description.oa | 1 – prodotto con file in versione Open Access (allegare il file al passo 5-Carica) | en_US |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.openairetype | Research report | - |
item.languageiso639-1 | en | - |
item.cerifentitytype | Publications | - |
item.grantfulltext | embargo_21000201 | - |
item.fulltext | With Fulltext | - |
crisitem.author.dept | IAPS Roma | - |
crisitem.author.dept | IAPS Roma | - |
crisitem.author.dept | IAPS Roma | - |
crisitem.author.dept | IAPS Roma | - |
crisitem.author.dept | IAPS Roma | - |
crisitem.author.dept | IAPS Roma | - |
crisitem.author.orcid | 0000-0003-0537-6376 | - |
crisitem.author.orcid | 0000-0001-8575-7712 | - |
crisitem.author.orcid | 0000-0001-9201-3025 | - |
crisitem.author.orcid | 0000-0002-0266-2556 | - |
crisitem.author.orcid | 0000-0002-4552-4292 | - |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | Existing users please |
---|---|---|---|---|
BC-SRN-RP-34254-01-04_ELENA_PFM_CalibrationReport.pdf | Calibration Report | 2.09 MB | Adobe PDF | Embargoed until February 1, 2100 |
Items in DSpace are published in Open Access, unless otherwise indicated.