NIRVANA: Ground layer Wavefront Sensor Verification & Acceptance Report - GWS ADP
Date Issued
2013
Abstract
In this document the results of the alignment procedure and verification tests of the Ground layer Wavefront Sensor DX (Unit 1) and SX (Unit 2) are described. The assembly, integration and main verification of the GWS DX lasted from June 2010 to February 2012, while the ones of GWS from January to September 2013. Both systems were integrated and aligned in the optical laboratory of the Astronomical Observatory of Padova (INAF–OAPD). In March 2012 the GWS DX was delivered to MPIA in Heidelberg where further tests have been performed until October 2012. In October 2013 GWS SX was delivered to Heidelberg. All verification results are listed in the verification matrix (AD27) both for SX and DX GWS systems.
Volume
LN-INAFP-VER-AO-001
Rights
restricted
File(s)![Thumbnail Image]()
Loading...
Name
LN-INAFP-VER-AO-001-Issue0.5.pdf
Description
[Administrators only]
Size
2.8 MB
Format
Adobe PDF
Checksum (MD5)
1e3c43b2ea8dd48dedbf972bc113dc1e