This document, Annex to the LFI Operation Plan PL-LFI-PST-PL-011, describes the in-flight planned operations for the Planck Sorption Cooler System (SCS) as defined in the Science Operations Implementation Plan and in the DPC Operations Scenario. Sorption Cooler operations will be under the responsibility of the SCS Instrument Operations Team (SCS IOT), located at the LFI DPC (Data Processing Centre) site, where Level 1 is run, with the support of the DPC team and of a number of specialists distributed geographically.
Sorption cooler system operation plan
MORGANTE, GIANLUCA
2008-01-01
Abstract
This document, Annex to the LFI Operation Plan PL-LFI-PST-PL-011, describes the in-flight planned operations for the Planck Sorption Cooler System (SCS) as defined in the Science Operations Implementation Plan and in the DPC Operations Scenario. Sorption Cooler operations will be under the responsibility of the SCS Instrument Operations Team (SCS IOT), located at the LFI DPC (Data Processing Centre) site, where Level 1 is run, with the support of the DPC team and of a number of specialists distributed geographically.File in questo prodotto:
| File | Dimensione | Formato | |
|---|---|---|---|
|
SCS Operation Plan 1_0 latest.pdf
accesso aperto
Licenza:
Non specificato
Dimensione
875.86 kB
Formato
Adobe PDF
|
875.86 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


