This document, Annex to the LFI Operation Plan PL-LFI-PST-PL-011, describes the in-flight planned operations for the Planck Sorption Cooler System (SCS) as defined in the Science Operations Implementation Plan and in the DPC Operations Scenario. Sorption Cooler operations will be under the responsibility of the SCS Instrument Operations Team (SCS IOT), located at the LFI DPC (Data Processing Centre) site, where Level 1 is run, with the support of the DPC team and of a number of specialists distributed geographically.

Sorption cooler system operation plan

MORGANTE, GIANLUCA
2008-01-01

Abstract

This document, Annex to the LFI Operation Plan PL-LFI-PST-PL-011, describes the in-flight planned operations for the Planck Sorption Cooler System (SCS) as defined in the Science Operations Implementation Plan and in the DPC Operations Scenario. Sorption Cooler operations will be under the responsibility of the SCS Instrument Operations Team (SCS IOT), located at the LFI DPC (Data Processing Centre) site, where Level 1 is run, with the support of the DPC team and of a number of specialists distributed geographically.
File in questo prodotto:
File Dimensione Formato  
SCS Operation Plan 1_0 latest.pdf

accesso aperto

Licenza: Non specificato
Dimensione 875.86 kB
Formato Adobe PDF
875.86 kB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12386/34679
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact