Title: | Testing Plan of the LFI instrument during the Planck Commissioning and CPV phase | Authors: | STRINGHETTI, LUCA Bersanelli, Marco CUTTAIA, FRANCESCO GREGORIO, Anna MENNELLA, ANIELLO MORGANTE, GIANLUCA TERENZI, LUCA Tomasi, Maurizio VILLA, Fabrizio |
Issue Date: | 2009 | Number: | PL-LFI-PST-PL-013 | Abstract: | This document describes the architecture of LFI tests to be performed during Commissioning and CPV phases. It is important to highlight that LFI CPV superposes in the timeline to HFI commissioning phase. The document shows the test flow to be followed, and contains the objective and description of tests to be performed, together with the specific requirements, hold points in the expected timeline, environmental conditions, references to procedures and User manual. The test sequence and other details could change to accomplish with the CoP and CPV Timelines, still to be frozen for the time being. | URI: | http://hdl.handle.net/20.500.12386/34720 | Fulltext: | open |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PST-PL-013_4-2.pdf | 898.86 kB | Adobe PDF | View/Open |
Items in DSpace are published in Open Access, unless otherwise indicated.