Title: | Planck SCS PFM1 test report | Authors: | MORGANTE, GIANLUCA Pearson, David Stassi, Patrick TERENZI, LUCA |
Issue Date: | 2006 | Number: | PL-LFI-PST-RP-016 | Abstract: | This document reports the results of SCS testing performed during the PFM1 test campaign at the CSL (Centre Spatial de Liège) facilities. Both SCS TMU’s were integrated on the S/C but only the unit indicated by SCS-R, officially considered the Redundant one of the two delivered by JPL, was tested. Ground testing of the Nominal unit, FM2, will be carried out in the next PFM2 test campaign. The test campaign spread over about 2 months, from February to March 2006. The SCS was first activated at the end of February for a warm healthcheck in order to check its functionality after shipping and then it was switched on again on March 18th 2006 for the actual cryogenic test: after a thermal vacuum healthcheck, the cooler was started and tested in all cases according to the test plan. This report covers tests, results and issues related to the SCS only. | URI: | http://hdl.handle.net/20.500.12386/34721 | Fulltext: | open |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PST-RP-016_1_0_FM1_TestReport_2006.pdf | 1.1 MB | Adobe PDF | View/Open |
Page view(s)
23
checked on Jul 18, 2024
Download(s)
5
checked on Jul 18, 2024
Google ScholarTM
Check
Items in DSpace are published in Open Access, unless otherwise indicated.