Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/34743
Title: | Decision support system for risk management in robust fast tracking projects | Authors: | FIERRO, Davide GIORLEO, GIUSEPPE Zoppoli, P. |
Issue Date: | 2008 | Journal: | Mathematics and Computers in Science and Engineering A Series of Reference Books and Textbooks | Volume: | RECENT ADVANCES IN SYSTEM SCIENCE AND SIMULATION IN ENGINEERING Proceedings of the 7th WSEAS International Conference on SYSTEM SCIENCE and SIMULATION in ENGINEERING (ICOSSSE '08) | First Page: | 266 | Abstract: | Modern management strategies aim for the maximum reduction of projects duration. Two schedule compression techniques are usually used, applied to activities on the critical path of course. The Crashing consists in allocating more resources on a certain activity to make it end before; in this case we obtain an increase of total project cost. The Fast Tracking (FT) reduces the project duration by anticipating the beginning of activities originally scheduled to start sequentially. This method changes the relationship of activities. With fast tracking, activities that would normally be done in sequence are allowed to be done in parallel or with some overlap. This technique involves a relevant increase of project risk that is proportional to the achieved time compression. We believe that should be convenient to anticipate the analysis of fast tracking risks to identify effective, preventive and precautionary mitigation measures. So we try to define a decision support system to identify the risk related to Fast Tracking and Robust Fast Tracking and to choose the best policy to reduce time and to mitigate risks. | Conference Name: | 7th WSEAS International Conference on SYSTEM SCIENCE and SIMULATION in ENGINEERING (ICOSSSE '08) | Conference Place: | Venezia | Conference Date: | November 21-23, 2008 | URI: | http://hdl.handle.net/20.500.12386/34743 | URL: | https://lens.org/011-422-478-030-233 http://www.wseas.us/e-library/conferences/2008/venice/icossse/icossse44.pdf |
ISSN: | 1790-2769 | ISBN: | 978-960-474-027-7 | Fulltext: | open |
Appears in Collections: | 3.01 Contributi in Atti di convegno |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Decision_Support_System_for_riskmng_in_Robust_Fast_Tracking.pdf | 417.38 kB | Adobe PDF | View/Open |
Page view(s)
26
checked on Jul 19, 2024
Download(s)
8
checked on Jul 19, 2024
Google ScholarTM
Check
Altmetric
Items in DSpace are published in Open Access, unless otherwise indicated.