Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/35206
Title: | CSL ACA Matrix Tuning Report | Authors: | TERENZI, LUCA CUTTAIA, FRANCESCO BATTAGLIA, Paola Maria D'Arcangelo, Ocleto Franceschet, Cristian Leonardi. Rodrigo Lowe, Stuart MENNELLA, ANIELLO Zonca, Andrea |
Issue Date: | 2008 | Number: | PL-LFI-PST-RP-043 | Abstract: | This document has been issued in the frame of ASI contract that has been released for the activities of Planck-LFI Phase E2 This document is a report of the LFI LNAs Tuning Verification performed at Centre Spatiale de Liege during the TV / TB campaign. In particular the test phases are from Ph–5–03 to Ph-5-04-d-1. | URI: | http://hdl.handle.net/20.500.12386/35206 | Fulltext: | open |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
ESA-40.pdf | 3.75 MB | Adobe PDF | View/Open |
Page view(s)
55
checked on Dec 10, 2024
Download(s)
3
checked on Dec 10, 2024
Google ScholarTM
Check
Items in DSpace are published in Open Access, unless otherwise indicated.