CSL Phase Switch Tuning Report
Date Issued
2008
Author(s)
•
D'Arcangelo, Ocleto
•
Lowe, Stuart
•
•
•
•
Franceschet, Cristian
•
Abstract
This document has been issued in the frame of ASI contract that has been released for the activities of
Planck-LFI Phase E2
This document is a report of the LFI Phase Switch Tuning Verification performed at Centre Spatial de
Liegi during the TV / TB campaing. In particular the test phase is the Ph –5–03–b1
Volume
PL-LFI-PST-RP-038
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
ESA-41.pdf
Size
2.61 MB
Format
Adobe PDF
Checksum (MD5)
6a068376fec42e564f9dd93595136dfb