Repository logo
  • English
  • Italiano
Log In
Have you forgotten your password?
  1. Home
  2. PRODOTTI RICERCA INAF
  3. 4 ALTRI PRODOTTI SCIENTIFICI (Other scientific products)
  4. 4.03 Rapporti di progetto
  5. CSL Phase Switch Tuning Report
 

CSL Phase Switch Tuning Report

Date Issued
2008
Author(s)
VILLA, Fabrizio  
•
D'Arcangelo, Ocleto
•
Lowe, Stuart
•
TERENZI, LUCA  
•
MENNELLA, ANIELLO  
•
BATTAGLIA, Paola Maria  
•
Franceschet, Cristian
•
CUTTAIA, FRANCESCO  
Abstract
This document has been issued in the frame of ASI contract that has been released for the activities of Planck-LFI Phase E2 This document is a report of the LFI Phase Switch Tuning Verification performed at Centre Spatial de Liegi during the TV / TB campaing. In particular the test phase is the Ph –5–03–b1
Volume
PL-LFI-PST-RP-038
Uri
http://hdl.handle.net/20.500.12386/35212
Rights
open.access
File(s)
Loading...
Thumbnail Image
Name

ESA-41.pdf

Size

2.61 MB

Format

Adobe PDF

Checksum (MD5)

6a068376fec42e564f9dd93595136dfb

Explore By
  • Communities and Collection
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Information and guides for authors
  • https://openaccess-info.inaf.it: all about open access in INAF
  • How to enter a product: guides to OA@INAF
  • The INAF Policy on Open Access
  • Downloadable documents and templates

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback