TV Tests: Contingency procedure due to drain currents overlimit
Date Issued
2008
Author(s)
Abstract
This document has been issued in the frame of ASI contract that has been released for the
activities of Planck-LFI Phase E2
Scope of this document is to give a description of the steps to be performed when a possible
contingency action is required, in particular when unexpected features on the drain currents
value is observed.
The test sequence will be applied if necessary while the LFI is in cryogenic condition under
vacuum inside the CSL facility.
The test is scheduled respect to TAS-F plan and test specification.
Volume
PL-LFI-PST-PR-027
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
ESA-48.pdf
Size
182.71 KB
Format
Adobe PDF
Checksum (MD5)
c290b06e0e6a771d0dbe9078ba2c2a26