Repository logo
  • English
  • Italiano
Log In
Have you forgotten your password?
  1. Home
  2. PRODOTTI RICERCA INAF
  3. 4 ALTRI PRODOTTI SCIENTIFICI (Other scientific products)
  4. 4.03 Rapporti di progetto
  5. TV Tests: Contingency procedure due to drain currents overlimit
 

TV Tests: Contingency procedure due to drain currents overlimit

Date Issued
2008
Author(s)
GREGORIO, Anna
•
CUTTAIA, FRANCESCO  
•
MENNELLA, ANIELLO  
Abstract
This document has been issued in the frame of ASI contract that has been released for the activities of Planck-LFI Phase E2 Scope of this document is to give a description of the steps to be performed when a possible contingency action is required, in particular when unexpected features on the drain currents value is observed. The test sequence will be applied if necessary while the LFI is in cryogenic condition under vacuum inside the CSL facility. The test is scheduled respect to TAS-F plan and test specification.
Volume
PL-LFI-PST-PR-027
Uri
http://hdl.handle.net/20.500.12386/35219
Rights
open.access
File(s)
Loading...
Thumbnail Image
Name

ESA-48.pdf

Size

182.71 KB

Format

Adobe PDF

Checksum (MD5)

c290b06e0e6a771d0dbe9078ba2c2a26

Explore By
  • Communities and Collection
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Information and guides for authors
  • https://openaccess-info.inaf.it: all about open access in INAF
  • How to enter a product: guides to OA@INAF
  • The INAF Policy on Open Access
  • Downloadable documents and templates

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback