This document has been issued in the frame of ASI contract that has been released for the activities of Planck-LFI Phase E2 Scope of this document is to give a description of a feature observed during PLM SIT test on RCA 23, this description could be used to open a dedicated NCR in order to monitor the problem through the System Test Campaign. The data shown here after have been collected during the PLM SIT performed on the 24th of October 2007 in Cannes.

Current Drop Noise in RCA 23 FEM

STRINGHETTI, LUCA;CUTTAIA, FRANCESCO
2007-01-01

Abstract

This document has been issued in the frame of ASI contract that has been released for the activities of Planck-LFI Phase E2 Scope of this document is to give a description of a feature observed during PLM SIT test on RCA 23, this description could be used to open a dedicated NCR in order to monitor the problem through the System Test Campaign. The data shown here after have been collected during the PLM SIT performed on the 24th of October 2007 in Cannes.
File in questo prodotto:
File Dimensione Formato  
ESA-56.pdf

accesso aperto

Licenza: Non specificato
Dimensione 188.8 kB
Formato Adobe PDF
188.8 kB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12386/35226
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact