SIMIONI, EMANUELEEMANUELESIMIONISLEMER, ALESSANDRAALESSANDRASLEMERDa Deppo, VaniaVaniaDa DeppoZUSI, MICHELEMICHELEZUSIPOLITI, ROMOLOROMOLOPOLITIRE, CristinaCristinaRECarlier, VincentVincentCarlierCAMBIANICA, PAMELAPAMELACAMBIANICACAPACCIONI, FABRIZIOFABRIZIOCAPACCIONICAPRIA, MARIA TERESAMARIA TERESACAPRIADoressundiram, AlainAlainDoressundiramLangeven, YvesYvesLangevenPALUMBO, PASQUALEPASQUALEPALUMBOVincendon, MathieuMathieuVincendonCREMONESE, GabrieleGabrieleCREMONESE2021-05-132021-05-132021http://hdl.handle.net/20.500.12386/30959http://dx.doi.org/10.20371/INAF/TechRep/89The present document has been issued to describe the Instrument Check Out Phase (ICO#1) Tests of STC, channel of the Spectrometers and Imagers for MPO BepiColombo Integrated Observatory SYStem (SIMBIO-SYS).ELETTRONICOenBC-SIM-TR-013 - STC ICO1 REPORT Issue 1.0Technical reportFIS/05 - ASTRONOMIA E ASTROFISICAERC sectors::Physical Sciences and Engineering::PE9 Universe sciences: astro-physics/chemistry/biology; solar systems; stellar, galactic and extragalactic astronomy, planetary systems, cosmology, space science, instrumentation