Salatti, MarioMarioSalattiLatini, ValentinaValentinaLatiniDucret, FranckFranckDucretGrimoldi, RaoulRaoulGrimoldiLegramandi, SergioSergioLegramandiAURICCHIO, NATALIANATALIAAURICCHIO2023-02-202023-02-202019http://hdl.handle.net/20.500.12386/33572The purpose of this report is to provide the results of the incoming inspection performed on the DPU/DCU FM 02 delivered by OHB-I, after shipping to the LAM laboratory on 29 October 2019. The inspection report contains the status of the unit after inspection and some pictures of the unpacking and the visual inspection.ELETTRONICOenIncoming inspection Report of the NI-DPU/DCU FM02Research reportFIS/05 - ASTRONOMIA E ASTROFISICA