DELLA CORTE, VINCENZOVINCENZODELLA CORTEZUSI, MICHELEMICHELEZUSISIMIONI, EMANUELEEMANUELESIMIONICAPACCIONI, FABRIZIOFABRIZIOCAPACCIONICAPRIA, MARIA TERESAMARIA TERESACAPRIADoressundiram, alainalainDoressundiramLangevin, YvesYvesLangevinPALUMBO, PASQUALEPASQUALEPALUMBOVincedon, MathieuMathieuVincedonCREMONESE, GabrieleGabrieleCREMONESE2021-10-072021-10-072021http://hdl.handle.net/20.500.12386/31063http://dx.doi.org/10.20371/INAF/TechRep/97The present document has been issued to describe the Instrument Check Out Phase (ICO#1) Tests of HRIC channel of the Spectrometers and Imagers for MPO BepiColombo Integrated Observatory SYStem (SIMBIO-SYS).ELETTRONICOenBC-SIM-TR-012 HRIC ICO1 REPORTTechnical reportING-IND/05 - IMPIANTI E SISTEMI AEROSPAZIALIERC sectors::Physical Sciences and Engineering::PE9 Universe sciences: astro-physics/chemistry/biology; solar systems; stellar, galactic and extragalactic astronomy, planetary systems, cosmology, space science, instrumentation