VIOTTO, VALENTINAVALENTINAVIOTTOBERGOMI, MariaMariaBERGOMI2023-02-242023-02-242013http://hdl.handle.net/20.500.12386/33828This document is a Technical report of the AIV of GWS DX and SX. The assembly, integration and main verification of the GWS DX lasted from June 2010 to February 2012. The system was integrated and aligned in the optical laboratory of the Astronomical Observatory of Padova (INAF–OAPD). In March 2012 the system was delivered to MPIA in Heidelberg where further tests have been performed until October 2012. The AIV of GWS SX, instead, took place in the first 9 months of 2013 in Padova.ELETTRONICOenNIRVANA: GWS AIT Technical Report - GWS ADPResearch reportFIS/05 - ASTRONOMIA E ASTROFISICA