POLITI, ROMOLOROMOLOPOLITIFONTE, SERGIOSERGIOFONTESIMIONI, EMANUELEEMANUELESIMIONIZUSI, MICHELEMICHELEZUSICAPACCIONI, FABRIZIOFABRIZIOCAPACCIONICAPRIA, MARIA TERESAMARIA TERESACAPRIADORESSOUNDIRAM, ALAINALAINDORESSOUNDIRAMLANGEVIN, YVESYVESLANGEVINPALUMBO, PASQUALEPASQUALEPALUMBOVINCENDON, MATHIEUMATHIEUVINCENDONCREMONESE, GabrieleGabrieleCREMONESE2021-02-042021-02-042021http://hdl.handle.net/20.500.12386/30211http://dx.doi.org/10.20371/INAF/TechRep/70This document describes all the tests performed during the second session of the Near-Earth Commissioning Phase (dNECP) by the Spectrometers and Imagers for MPO BepiColombo Integrated Observatory SYStem (SIMBIO-SYS). The test session whose plan is described in the SIMBIO-SYS dNECP Test on June 6th, 2019. For each test, a sheet with the pipeline report and a discussion on the detected anomalies are given.ELETTRONICOenBC-SIM-TR-006 - SIMBIO-SYS EGSE dNECP reportTechnical reportFIS/05 - ASTRONOMIA E ASTROFISICA