SORDINI, RobertoRobertoSORDINIMURA, AlessandroAlessandroMURAADRIANI, AlbertoAlbertoADRIANIAGOSTINI, LIVIOLIVIOAGOSTININOSCHESE, RAFFAELLARAFFAELLANOSCHESECICCHETTI, ANDREAANDREACICCHETTI2023-02-102023-02-102022http://hdl.handle.net/20.500.12386/33365Purpose of this document is to provide engineering status of JIRAM instrument by reviewing instrument health and performance. The JIRAM Trending Review is required annually by the Juno Project. JIRAM operated during PJ1 and from PJ4 through PJ44 . This review cover the period PJ36-PJ44, so the first orbit of the Juno Extended Mission.ELETTRONICOenJIRAM Trending Review 2022Research reportFIS/05 - ASTRONOMIA E ASTROFISICAERC sectors::Physical Sciences and Engineering::PE9 Universe sciences: astro-physics/chemistry/biology; solar systems; stellar, galactic and extragalactic astronomy, planetary systems, cosmology, space science, instrumentation::PE9_2 Planetary systems sciences