DELLA CORTE, VINCENZOVINCENZODELLA CORTEZUSI, MICHELEMICHELEZUSISIMIONI, EMANUELEEMANUELESIMIONICREMONESE, GabrieleGabrieleCREMONESECAPACCIONI, FABRIZIOFABRIZIOCAPACCIONIDoressoundiram, AlainAlainDoressoundiramPALUMBO, PASQUALEPASQUALEPALUMBORE, CristinaCristinaREVincendon, MathieuMathieuVincendon2022-10-192022-10-192022http://hdl.handle.net/20.500.12386/32702https://doi.org/10.20371/INAF/TechRep/190The present document has been issued to describe the Instrument Check Out Phase (ICO#3) Tests of HRIC, channel of the Spectrometers and Imagers for MPO BepiColombo Integrated Observatory SYStem (SIMBIO-SYS).ELETTRONICOenBC-SIM-TR-025 HRIC ICO3 REPORTTechnical reportFIS/05 - ASTRONOMIA E ASTROFISICA