MEDINACELI VILLEGAS, EduardoEduardoMEDINACELI VILLEGASSIRIGNANO, CHIARACHIARASIRIGNANO2024-01-222024-01-222020http://hdl.handle.net/20.500.12386/34570The objective of this document is to provide the test plan carried out on v1.3.7 of the DPU ASW and to report the test results. It is worth mentioning that DPU ASW v1.3.5 was qualified and accepted at subsystem level and the QAR at NISP level is currently ongoing. This document is focused on the ASW test phase carried out on DPU AVM at TAS premises in Turin after its qualification to validate the applicative before installing it on DPU FM units.ELETTRONICOenNI-DPU ASW v1.3.7 Test Plan and Test ReportResearch reportFIS/05 - ASTRONOMIA E ASTROFISICAERC sectors::Physical Sciences and Engineering::PE8 Products and Processes Engineering: Product design, process design and control, construction methods, civil engineering, energy systems, material engineering