DE ANGELIS, ElisabettaElisabettaDE ANGELIS2023-02-222023-02-222018http://hdl.handle.net/20.500.12386/33760SERENA package has to manage Flight Operation and Near Earth Commissioning Phase after BepiColombo launch. The status of procedures for the 4 units and System Control Unit and in-flight test plan has been reported.ELETTRONICOenSERENA Flight Operation - NECP1-2 - StatusResearch reportFIS/05 - ASTRONOMIA E ASTROFISICAERC sectors::Physical Sciences and Engineering::PE9 Universe sciences: astro-physics/chemistry/biology; solar systems; stellar, galactic and extragalactic astronomy, planetary systems, cosmology, space science, instrumentation