Salatti, MarioMarioSalattiLatini, ValentinaValentinaLatiniDucret, FranckFranckDucretMaciaszek, ThierryThierryMaciaszekDusini, StefanoStefanoDusiniAURICCHIO, NATALIANATALIAAURICCHIO2023-02-202023-02-202019http://hdl.handle.net/20.500.12386/33571The purpose of this report is to provide the results of the incoming inspection performed on the DPU/DCU PFM (FM01) delivered by OHB-I, after shipping to the LAM laboratory on 8 July 2019. The inspection report contains the status of the unit after inspection and some pictures of the unpacking and the visual inspectionELETTRONICOenIncoming inspection Report of the NI-DPU/DCU PFMResearch reportFIS/05 - ASTRONOMIA E ASTROFISICA