GREGORIO, AnnaAnnaGREGORIOCUTTAIA, FRANCESCOFRANCESCOCUTTAIAMENNELLA, ANIELLOANIELLOMENNELLA2024-06-242024-06-242008http://hdl.handle.net/20.500.12386/35219This document has been issued in the frame of ASI contract that has been released for the activities of Planck-LFI Phase E2 Scope of this document is to give a description of the steps to be performed when a possible contingency action is required, in particular when unexpected features on the drain currents value is observed. The test sequence will be applied if necessary while the LFI is in cryogenic condition under vacuum inside the CSL facility. The test is scheduled respect to TAS-F plan and test specification.ELETTRONICOenTV Tests: Contingency procedure due to drain currents overlimitResearch reportFIS/05 - ASTRONOMIA E ASTROFISICAERC sectors::Physical Sciences and Engineering::PE9 Universe sciences: astro-physics/chemistry/biology; solar systems; stellar, galactic and extragalactic astronomy, planetary systems, cosmology, space science, instrumentation::PE9_17 Instrumentation – telescopes, detectors and techniques