MEDINACELI VILLEGAS, EduardoEduardoMEDINACELI VILLEGASDusini, StefanoStefanoDusiniSIRIGNANO, CHIARACHIARASIRIGNANO2024-01-222024-01-222020http://hdl.handle.net/20.500.12386/34575The objective of this document is to provide the test plan carried out on NISP WE using ICU ASW v1.8, DPU ASW v1.3.7 and MIB release 3.60. This document is focused on the NISP WE test phase carried out on DPU AVM at TAS premises in Turin on November 9 and 10, to validate the applicatives and the relate MIB before installing it on NISP WE FM units.ELETTRONICOenTest plan for integrated NISP WE ASW test (ICU ASW v1.8, DPU ASW v1.3.7, MIB 3.60)Research reportFIS/05 - ASTRONOMIA E ASTROFISICAERC sectors::Physical Sciences and Engineering::PE8 Products and Processes Engineering: Product design, process design and control, construction methods, civil engineering, energy systems, material engineering