FRANCESCHI, ENRICOENRICOFRANCESCHITRIFOGLIO, MASSIMOMASSIMOTRIFOGLIO2023-02-202023-02-202017http://hdl.handle.net/20.500.12386/33560The objective of this document is to give the requirements applicable to the various Electrical Ground Support Equipment (EGSE) that shall be required in order to support: - the NISP AIV/AIT activities to be performed at Unit, Assembly and Instrument level on the NISP EQM/AVM and FM before delivery to ESA; - the AIV/AIT activities that shall be carried out at PLM/SVM level on the NISP Models (AVM, FM) delivered to ESA.ELETTRONICOenEuclid NISP EGSE Requirement SpecificationResearch reportFIS/05 - ASTRONOMIA E ASTROFISICAERC sectors::Physical Sciences and Engineering::PE8 Products and Processes Engineering: Product design, process design and control, construction methods, civil engineering, energy systems, material engineering