Incoming inspection Report of the NI-DPU/DCU FM02
Date Issued
2019
Author(s)
Salatti, Mario
•
Latini, Valentina
•
Ducret, Franck
•
Grimoldi, Raoul
•
Legramandi, Sergio
•
Abstract
The purpose of this report is to provide the results of the incoming inspection performed on the DPU/DCU FM 02 delivered by OHB-I, after shipping to the LAM laboratory on 29 October 2019.
The inspection report contains the status of the unit after inspection and some pictures of the unpacking and the visual inspection.
Volume
EUCL-LAM-RP-7-097
Rights
restricted
File(s)![Thumbnail Image]()
Loading...
Name
EUCL-LAM-RP-7-097_10_DPU_FM02_incoming_inspection_report_2.pdf
Description
[Administrators only]
Size
2.57 MB
Format
Adobe PDF
Checksum (MD5)
2142ec836679433cb425386b1e1a6f81
