NI-DPU ASW v1.3.8 Test Plan and Test Report
Date Issued
2021
Author(s)
Abstract
The objective of this document is to provide the test plan carried out on v1.3.8 of the DPU ASW and to
report the test results. All tests were done at system level.
This document is focused on the ASW test phase carried out on DPU AVM at TAS premises in Turin
after its qualification to validate the applicative before installing it on DPU FM units
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
EUCL-IBO-TN-7-037_NI-DPU-ASWv1.3.8-Test plan_report.pdf
Size
6.04 MB
Format
Adobe PDF
Checksum (MD5)
92e5792d80b55d88d273bb79433c90a7
