Sorption cooler system operation plan
Date Issued
2008
Author(s)
Abstract
This document, Annex to the LFI Operation Plan PL-LFI-PST-PL-011, describes the in-flight planned operations for the Planck Sorption Cooler System (SCS) as defined in the Science Operations Implementation Plan and in the DPC Operations Scenario. Sorption Cooler operations will be under the responsibility of the SCS Instrument Operations Team (SCS IOT), located at the LFI DPC (Data Processing Centre) site, where Level 1 is run, with the support of the DPC team and of a number of specialists distributed geographically.
Volume
PL-LFI-PST-PL-011 ANNEX I
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
SCS Operation Plan 1_0 latest.pdf
Size
875.86 KB
Format
Adobe PDF
Checksum (MD5)
c2aa27247840420bb70838e1bf0236f4