Repository logo
  • English
  • Italiano
Log In
Have you forgotten your password?
  1. Home
  2. PRODOTTI RICERCA INAF
  3. 3 CONTRIBUTI IN ATTI DI CONVEGNO (Proceedings)
  4. 3.01 Contributi in Atti di convegno
  5. SPHERE on-sky performance compared with budget predictions
 

SPHERE on-sky performance compared with budget predictions

Date Issued
2016
Author(s)
Dohlen, Kjetil
•
Vigan, Arthur
•
Mouillet, David
•
Wildi, François
•
Sauvage, Jean-François
•
Fusco, Thierry
•
Beuzit, Jean-Luc
•
Puget, Pascal
•
Le Mignant, David
•
Roelfsema, Ronald
•
Pragt, Johan
•
Schmid, Hans Martin
•
GRATTON, Raffaele  
•
MESA, DINO  
•
CLAUDI, Riccardo  
•
Langlois, Maud
•
Costille, Anne
•
Hugot, Emmanuel
•
O'Neil, Jared
•
Guerra, Juan Carlos
•
N'Diaye, Mamadou
•
Girard, Julien
•
Mawet, Dimitri
•
Zins, Gerard
DOI
10.1117/12.2233953
Abstract
The SPHERE (spectro-photometric exoplanet research) extreme-AO planet hunter saw first light at the VLT observatory on Mount Paranal in May 2014 after ten years of development. Great efforts were put into modelling its performance, particularly in terms of achievable contrast, and to budgeting instrumental features such as wave front errors and optical transmission to each of the instrument's three focal planes, the near infrared dual imaging camera IRDIS, the near infrared integral field spectrograph IFS and the visible polarimetric camera ZIMPOL. In this paper we aim at comparing predicted performance with measured performance. In addition to comparing on-sky contrast curves and calibrated transmission measurements, we also compare the PSD-based wave front error budget with in-situ wave front maps obtained thanks to a Zernike phase mask, ZELDA, implemented in the infrared coronagraph wheel. One of the most critical elements of the SPHERE system is its high-order deformable mirror, a prototype 40x40 actuator piezo stack design developed in parallel with the instrument itself. The development was a success, as witnessed by the instrument performance, in spite of some bad surprises discovered on the way. The devastating effects of operating without taking properly into account the loss of several actuators and the thermally and temporally induced variations in the DM shape will be analysed, and the actions taken to mitigate these defects through the introduction of specially designed Lyot stops and activation of one of the mirrors in the optical train will be described.

Coverage
Ground-based and Airborne Instrumentation for Astronomy VI
All editors
Evans, Christopher J.; Simard, Luc; Takami, Hideki
Series
PROCEEDINGS OF SPIE  
Volume
9908
Start page
99083D
Conferenece
Ground-based and Airborne Instrumentation for Astronomy VI
Conferenece place
Edinburgh, UK
Conferenece date
26 June - 1 July, 2016
Uri
http://hdl.handle.net/20.500.12386/27846
Url
https://www.spiedigitallibrary.org/conference-proceedings-of-spie/9908/1/SPHERE-on-sky-performance-compared-with-budget-predictions/10.1117/12.2233953.full?SSO=1
Issn Identifier
0277-786X
Ads BibCode
2016SPIE.9908E..3DD
Rights
open.access
File(s)
Loading...
Thumbnail Image
Name

99083D.pdf

Description
Pdf editoriale
Size

802.1 KB

Format

Adobe PDF

Checksum (MD5)

1733dc3d61333642a03f0ca2872b3020

Explore By
  • Communities and Collection
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Information and guides for authors
  • https://openaccess-info.inaf.it: all about open access in INAF
  • How to enter a product: guides to OA@INAF
  • The INAF Policy on Open Access
  • Downloadable documents and templates

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback