Analysis of Signal Swap in output of Channel 2510 (Action#4 H-PTASF- MN-9737)
Date Issued
2009
Author(s)
Abstract
Scope of this document is to provide a description of an unexpected feature observed on RCA 25 during
EMC Conducted test., During data analysis was found that the same behaviour was present in SFT data
and in PLM SIT test data. This description shall be used to update the dedicated NCR, in order to monitor
the problem through the System Test Campaign. The data shown here after have been collected during the
EMC Conducted performed on 2nd October (AMB_108) PLM SIT performed on the 24th of October
2007 (AMB_0114) in Cannes and from the SFT performed 18th September (AMB_0099).
Volume
PL-LFI-PST-TN-082
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
ESA-29.pdf
Size
889.48 KB
Format
Adobe PDF
Checksum (MD5)
9ccd6e88a98f016537ced91a6d4c7361