Repository logo
  • English
  • Italiano
Log In
Have you forgotten your password?
  1. Home
  2. PRODOTTI RICERCA INAF
  3. 4 ALTRI PRODOTTI SCIENTIFICI (Other scientific products)
  4. 4.03 Rapporti di progetto
  5. ICU FM Electrical Integration Test Procedure: AS RUN
 

ICU FM Electrical Integration Test Procedure: AS RUN

Date Issued
2020
Author(s)
AURICCHIO, NATALIA  
•
Borsato, Enrico
•
Di Ferdinando, Donato
•
Davini, Stefano
•
Dusini, Stefano
•
SIRIGNANO, CHIARA  
•
Sirri, Gabriele
•
Valieri, Claudia
Abstract
The purpose of this document is to describe the electrical and ASW integration procedure of ICU FM. The procedure is applicable to the ICU FM integration in preparation to the NISP FM TV test 1 and 2. The integration will use the NISP SCOE as S/C simulator. The document describes the ICU PFM electrical integration “As Run
Volume
EUCL-INFN-PR-7-006
Uri
http://hdl.handle.net/20.500.12386/33570
Rights
restricted
File(s)
Loading...
Thumbnail Image
Name

EUCL-INFN-PR-7-006_ICU-PFM 01-Electrical-Integration-Procedure_Issue 1_2_Signed.pdf

Description
[Administrators only]
Size

2.1 MB

Format

Adobe PDF

Checksum (MD5)

ea91f1cd9ad60dc0c780d92f804abe3b

Explore By
  • Communities and Collection
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Information and guides for authors
  • https://openaccess-info.inaf.it: all about open access in INAF
  • How to enter a product: guides to OA@INAF
  • The INAF Policy on Open Access
  • Downloadable documents and templates

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback