Repository logo
  • English
  • Italiano
Log In
Have you forgotten your password?
  1. Home
  2. PRODOTTI RICERCA INAF
  3. 4 ALTRI PRODOTTI SCIENTIFICI (Other scientific products)
  4. 4.03 Rapporti di progetto
  5. Testing Plan of the LFI instrument during the Planck Commissioning and CPV phase
 

Testing Plan of the LFI instrument during the Planck Commissioning and CPV phase

Date Issued
2009
Author(s)
STRINGHETTI, LUCA  
•
Bersanelli, Marco  
•
CUTTAIA, FRANCESCO  
•
GREGORIO, Anna
•
MENNELLA, ANIELLO  
•
MORGANTE, GIANLUCA  
•
TERENZI, LUCA  
•
Tomasi, Maurizio
•
VILLA, Fabrizio  
Abstract
This document describes the architecture of LFI tests to be performed during Commissioning and CPV phases. It is important to highlight that LFI CPV superposes in the timeline to HFI commissioning phase. The document shows the test flow to be followed, and contains the objective and description of tests to be performed, together with the specific requirements, hold points in the expected timeline, environmental conditions, references to procedures and User manual. The test sequence and other details could change to accomplish with the CoP and CPV Timelines, still to be frozen for the time being.
Volume
PL-LFI-PST-PL-013
Uri
http://hdl.handle.net/20.500.12386/34720
Rights
open.access
File(s)
Loading...
Thumbnail Image
Name

PST-PL-013_4-2.pdf

Size

898.86 KB

Format

Adobe PDF

Checksum (MD5)

3aac9e2063fe74027ab571db8fcd4891

Explore By
  • Communities and Collection
  • Research Outputs
  • Researchers
  • Organizations
  • Projects
Information and guides for authors
  • https://openaccess-info.inaf.it: all about open access in INAF
  • How to enter a product: guides to OA@INAF
  • The INAF Policy on Open Access
  • Downloadable documents and templates

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback