Incoming inspection Report of the NI-DPU/DCU PFM
Date Issued
2019
Author(s)
•
Latini, Valentina
•
Ducret, Franck
•
Maciaszek, Thierry
•
Dusini, Stefano
•
Abstract
The purpose of this report is to provide the results of the incoming inspection performed on the DPU/DCU PFM (FM01) delivered by OHB-I, after shipping to the LAM laboratory on 8 July 2019.
The inspection report contains the status of the unit after inspection and some pictures of the unpacking and the visual inspection
Volume
EUCL-LAM-RP-7-096
Rights
restricted
File(s)![Thumbnail Image]()
Loading...
Name
EUCL-LAM-RP-7-096_10_DPU PFM incoming inspection report_Iss1-signed.pdf
Description
[Administrators only]
Size
2.47 MB
Format
Adobe PDF
Checksum (MD5)
88f892ad4889ecc2b91ef17145d9d170
