Planck-LFI In-Orbit Calibration and Verification Phase Report: Executive Summary
Date Issued
2009
Author(s)
•
•
•
Davis, Richard
•
•
Franceschet, Cristian
•
•
•
GREGORIO, Anna
•
Leonardi, Rodrigo
•
Lowe, Stuart
•
•
Meinhold, Peter
•
Mendes, Luis
•
•
Poutanen,Torsti
•
•
•
•
Tomasi, Maurizio
•
•
•
Zonca, Andrea
Abstract
This document summarises the results obtained during the commissioning tests performed on the LFI integrated on the Planck satellite. Tests have been conducted from June the 4th 2009 to June 26th 2009. Details of the performed activities are discussed in specific reports that will be available after the CPV.
Volume
PL-LFI-PST-RP-086
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
PL-LFI-PST-RP-086_1.1_CPV.pdf
Description
Planck-LFI In-Orbit Calibration and Verification Phase Report: Executive Summary
Size
1.09 MB
Format
Adobe PDF
Checksum (MD5)
3f266d2bd39d518b5afb73ec7f5281ff
