Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/28267
Title: | SKA telescope manager: a status update | Authors: | Bridger, Alan Gupta, Yashwant Chaudhuri, Subhrojyoti R. DI CARLO, Matteo Le Roux, Gerhard Natarajan, Swaminathan SMAREGLIA, Riccardo Patil, Mangesh Barbosa, Domingos van den Heever, Lize DOLCI, Mauro ALBERTI, Valentina Brederode, Ray Barraca, Joao Paulo Bartashevich, Dzianis Bergano, Miguel Brajnik, Giorgio CANZARI, Matteo Dange, Aditya Guzman, Juan Carlos JERSE, GIOVANNA Khanvilkar, Amruta Klaassen, Pamela KNAPIC, Cristina Kodikar, Jitendra Kumthekar, Vikas Maia, Dalmiro Mohile, Vivek Morgado, Bruno Nakave, Snehal Nicol, Mark O'Brien, Alan Ramanujam, Niruj M. Ranpura, Jyotin Reed, Steven Sathe, Vinod Silva, Nuno Swart, Paul TINARELLI, FRANCO Trivedi, Vatsal Babani, Lochan Valame, Snehal Vrcic, Sonja Williams, Stewart Wadadekar, Yogesh |
Issue Date: | 2018 | Volume: | Software and Cyberinfrastructure for Astronomy V | Editors: | Guzman, Juan C.; Ibsen, Jorge | Series: | PROCEEDINGS OF SPIE | Number: | 10707 | First Page: | 1070703 | Abstract: | The international Square Kilometre Array (SKA) project to build two radio interferometers is approaching the end of its design phase, and gearing up for the beginning of formal construction. A key part of this distributed Observatory is the overall software control system: the Telescope Manager (TM). The two telescopes, a Low frequency dipole array to be located in Western Australia (SKA-Low) and a Mid-frequency dish array to be located in South Africa (SKA-Mid) will be operated as a single Observatory, with its global headquarters (GHQ) based in the United Kingdom at Jodrell Bank. When complete it will be the most powerful radio observatory in the world. The TM software must combine the observatory operations based at the GHQ with the monitor and control operations of each telescope, covering the range of domains from proposal submission to the coordination and monitoring of the subsystems that make up each telescope. It must also monitor itself and provide a reliable operating platform. This paper will provide an update on the design status of TM, covering the make-up of the consortium delivering the design, a brief description of the key challenges and the top level architecture, and its software development plans for tackling the construction phase of the project. It will also briefly describe the consortium's response to the SKA Project's decision in the second half of 2016 to adopt the processes set out by the Software Engineering Institute (SEI) for system architecture design and documentation, including a re-evaluation of its deliverables, documentation and approach to internal reviews. | Conference Name: | Software and Cyberinfrastructure for Astronomy V | Conference Place: | Austin, Texas, United States | Conference Date: | 10-15 June, 2018 | URI: | http://hdl.handle.net/20.500.12386/28267 | URL: | https://www.spiedigitallibrary.org/conference-proceedings-of-spie/10707/2313649/SKA-telescope-manager-a-status-update/10.1117/12.2313649.short | ISSN: | 0277-786X | ISBN: | 9781510619678 9781510619685 |
DOI: | 10.1117/12.2313649 | Bibcode ADS: | 2018SPIE10707E..03B | Fulltext: | open |
Appears in Collections: | 3.01 Contributi in Atti di convegno |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
1070703.pdf | Pdf editoriale | 603.47 kB | Adobe PDF | View/Open |
Page view(s)
53
checked on Apr 27, 2024
Download(s)
40
checked on Apr 27, 2024
Google ScholarTM
Check
Altmetric
Altmetric
Items in DSpace are published in Open Access, unless otherwise indicated.