BC-SIM-TN-004 SIMBIO-SYS_FOP_update_after_NECP_12May2019
Date Issued
2019
Author(s)
•
•
•
•
Noscese Raffaella
•
•
•
Alain Doressoundiram
•
Yves Langevin
•
•
Mathieu Vincendon
•
Abstract
This document, in according to the Spectrometers and Imagers for MPO BepiColombo Integrated Observatory SYStem (SIMBIO-SYS) Technical Note, Layout and Data flow agreement reports all the Flight Operation Procedures (FOPs) SIMBIO-SYS to be used during the operational phases of the instrument. It conseiders all the improvements made after the Near Earth Commissioning Phase (NECP) and before ICO1 phase.
Differently from the date in the header, present Technical Note refers to activities performed
between December 2018 and June 2019 partially anticipated in BC-SIM-TN-001-SIMBIOSYS_FOPs_Description_Issue1
Report number
58
Rights
open.access
File(s)![Thumbnail Image]()
![Thumbnail Image]()
Loading...
Name
BC-SIM-TN-004 SIMBIO-SYS_FOP_update_after_NECP_12May2019.pdf
Description
T.Report updated
Size
4.88 MB
Format
Adobe PDF
Checksum (MD5)
c240cfb7a7c25924f0004850ddd1ae2e
Loading...
Name
modello-autorizzazione_BC_SIM_TN-004.pdf
Description
[Administration only]
Size
243.04 KB
Format
Adobe PDF
Checksum (MD5)
3426c8d0e18eb679c7485c34acfc545a